The Cynwyd Trail Just Reached Bala Station. The New Building Next Door Helped Pay For It.

Ride the Cynwyd Heritage Trail north from the old cotton mill ruins today and the pavement doesn't stop where it used to. It used to end near Cynwyd Station, a quiet Victorian stop where the asphalt gave way to gravel and a turnaround. Now it keeps going, tracing the SEPTA line past Conshohocken State Road, past the edge of Bala Cynwyd Park, and straight into the parking lot at Bala Station, where the trail meets a City Avenue bridge currently wrapped in scaffolding. The pavement is finished. The bridge above it is not.

That gap between what's done and what's still under construction is the actual story here, and it says something the trail's own map didn't used to.

Where the Trail Actually Ends Now

The rail-with-trail extension linking Cynwyd Station to SEPTA's Bala Station opened in March 2026, closing a stretch that residents along Conshohocken State Road had been waiting on for years. The Friends of the Cynwyd Heritage Trail marked the opening with sixteen new safety and etiquette signs installed along the route in partnership with Lower Merion Township's Parks and Recreation Department, with pavement striping to follow. For the households along Conshohocken State Road, it means direct trail access that didn't exist a year ago. For everyone else, it means the 2-mile Cynwyd Heritage Trail, which has run since 2011 from Cynwyd Station to Belmont Avenue along a decommissioned stretch of SEPTA's old R-6 line, now has a second front door at Bala Station.

The Money Behind the Last Half-Mile

Here's the part that doesn't show up on a trail map. The extension was funded largely through state transportation grants, which covered about 90 percent of the cost. The remaining share came from Lower Merion Township, and the township didn't pull that money from its general parks budget. It came from recreation fees charged to new development along City Avenue, the same wave of construction that includes the apartment building now standing where a Lord & Taylor used to be.

That's not a coincidence of timing. City Avenue's transformation traces back to a rezoning effort Lower Merion Township pushed through in the 2010s, and the fees attached to each new residential project have become one of the ways the township pays for the public infrastructure sitting alongside them. Chris Leswing, the township's director of building and planning, described the broader pattern to the Philadelphia Business Journal as coming together according to plan. Two more projects are part of that plan right now: Hanover Co. is building 412 units with ground-floor commercial space at 111 Presidential Boulevard, and Core Development is building 86 units with 3,500 square feet of retail at 206 Bala Avenue. Every one of those projects pays into the same fee structure that helped extend the trail to Bala Station.

A Bridge That Won't Match the Trail Until 2027

The reason the new stretch of trail dead-ends at a construction zone is that the City Avenue bridge over the SEPTA Cynwyd line is mid-rehabilitation, and has been since PennDOT's contractor broke ground on the work in March 2025. The bridge itself is a concrete arch structure, originally built in 1910 and widened in 1934, and the $22.4 million project underway now includes a new ADA ramp and stair system meant to connect City Avenue, Bala Station, and the trail corridor PennDOT refers to in its own project documents as the Parkside Cynwyd Trail. Traffic on City Avenue between Bryn Mawr Avenue and 47th Street has been down to one lane in each direction for stretches of the project, with the most recent restriction running from October 2025 through an expected completion around June 2027.

While the bridge work continues, the eastern lot at Bala Station is doing double duty as a staging area for construction crews. SEPTA and the township have said that once the work wraps, a small number of parking spaces in that lot will be removed permanently so the trail can continue through the lot and pass beneath the bridge itself, rather than routing around it. Philadelphia has also agreed to extend the trail on its own side of the river, a piece that would eventually bring it closer to the Mann Center and connect it into Fairmount Park's trail network. None of that exists yet. What exists is a finished half-mile of new pavement running straight into a job site that isn't expected to be done until around June 2027.

What Opened at the Other End of the Pavement

Walk the new extension to its Bala Station terminus and you're standing at the edge of what used to be a Lord & Taylor. Federal Realty Investment Trust demolished the old department store after it closed in 2020, and in its place built Blayr, a 217-unit residential building that opened to its first residents on April 1, 2026. The ground floor carries about 16,000 square feet of retail, and three tenants have been named for those spaces: Chopt, the salad chain that got its start in Union Square in 2001; NAYA, a build-your-own Middle Eastern bowl and wrap concept founded by Hady Kfoury; and Hammer & Nails, a men's grooming shop. All three were expected to open by summer 2026. Two months after Blayr opened, Federal Realty reported the building was 55 percent leased, ahead of its own projected pace, with full occupancy expected by fall, which is to say around now.

A few blocks over, the City Avenue District ran its first-ever farmers market this year, set up Saturday mornings from 10 a.m. to 2 p.m. in the parking lot at One Belmont Avenue, rain or shine. It's a small addition next to a $170 million redevelopment, but it's the kind of thing that changes what a Saturday morning near the trailhead actually looks like.

The Trail's Own Calendar This Fall

Some of what's new here has nothing to do with construction cranes. The Friends of the Cynwyd Heritage Trail had scheduled an outdoor movie night for Friday, September 25, at Cynwyd Station Park, showing Hocus Pocus at 7 p.m., with popcorn provided and neighbors asked to bring their own chairs or blankets. The rain location was the second floor of the Union Fire Association. That event was a partnership between the Friends group, the Neighborhood Club of Bala Cynwyd, the City Ave Development Corporation, and the Lower Main Line Rotary Club, a fair snapshot of how much of this trail's upkeep runs on volunteer coordination rather than township funding alone.

Two other pieces are still in motion. Lower Merion commissioners have adopted a resolution supporting a township application for a $150,000 grant to bring the Indigo bike-share program to the City Avenue area, though nothing has been approved or installed yet. And the township is separately exploring funding to connect the Cynwyd Heritage Trail through the Norfolk Southern Tunnel to the Pencoyd Trail, a link that would open up the natural area on the tunnel's far side without requiring trail users to detour around it.

None of these projects are finished. The bridge is scaffolded. The bike share is a grant application. The tunnel connection is a feasibility conversation. What's actually done is the half-mile of new pavement between Cynwyd Station and Bala Station, and the fact that it got built at all traces back to a fee structure most people walking their dogs on it have never heard of.

The trail got longer this year because the neighborhood around it got denser first.

If you're watching how development along City Avenue and the rest of the Main Line is reshaping the trails, parks, and streets you already know, the Karen Strid Team tracks these changes closely and is always glad to talk through what they mean for the neighborhood.